Test
Tender Details FAVORITE EXPIRED
Share

Object
TRAVAUX DE RECONSTRUCTION DES ETABLISSEMENTS SCOLAIRES RELEVANT DE LA PROVINCE DE CHICHAOUA EN 11 LOTS :
Public Client
CG / AGHA - AGENCE DE DEVELOPPEMENT DU HAUT ATLAS
Time to Deadline
-110 days
Deadline
16 de junio de 2026 a las 10:00 Morocco time
Total Estimate
33 711 840,00
Total Guarantee
Sign in
Reference
Sign in
Published
Sign in
Main Category
Travaux
Execution Location
Sign in
Procedure
Appel d'offres ouvert
Awarding Mode
Sur offre de prix
Electronic bidding
Not Applicable
Electronic signature
Not Applicable
Reserved to SMBs, individuals, Unions, ...
Variants accepted
No

1 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES A LA COMMUNE ADASSIL : AZIB ASSAIS (22208N), ET IGHERMANE (03202E).
Estimate: 6 059 940,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
2 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES A LA COMMUNE AIT HADDOU YOUSSEF : ASSIF LAHLOU (03031U), ET TASSA (03028R).
Estimate: 3 629 532,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
3 TRAVAUX DE RECONSTRUCTION DE L’ECOLE TINOUALINE (20441T) A LA COMMUNE LALLA AAZIZA.
Estimate: 1 389 912,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
4 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES : CHERKAOUA (02849W) A LA COMMUNE AIT HADI ; ET HAJJAJ ALHARROUSSIA (02874Y) A LA COMMUNE LAMZOUDIA.
Estimate: 1 991 220,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
5 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES A LA COMMUNE OUAD ELBOUR : IMERJANE (03093L), ET TALAINTE (02973F).
Estimate: 2 492 226,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
6 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES A LA COMMUNE IROHALEN : TAGUENZA AKENTAR (02983S), ET TAJGALTE (19034N).
Estimate: 2 904 684,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
7 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES A LA COMMUNE OUAD ELBOUR : ASSEDRAM (02975H), ET IMINE LAAINE (02970C).
Estimate: 2 151 030,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
8 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES A LA COMMUNE OUAD ELBOUR : TALMEST CENTRE (02976J), ET TIRGUINE (02977K).
Estimate: 3 005 220,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
9 TRAVAUX DE RECONSTRUCTION DE 02 ECOLES A LA COMMUNE IROHALEN : TAMAROUT (02982R), ET TIJDINE (20433J).
Estimate: 4 049 952,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
10 TRAVAUX DE RECONSTRUCTION DE L’ECOLE IMIN IGHZER NAISSA (03199B) A LA COMMUNE IMINDOUNIT.
Estimate: 3 257 634,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in
11 TRAVAUX DE RECONSTRUCTION DE 03 ECOLES A LA COMMUNE DOUIRANE : AGADIR OUMNSOUR (03142P), AIT ALI OUZZEM (03141N), ET IZEROUANE (03147V).
Estimate: 2 780 490,00 Guarantee: Sign in Category: Travaux Variant: No Reserved: Sign in

Travaux / Travaux de construction et d’aménagement / Travaux d’aménagement, d’entretien et réhabilitation des bâtiments

Withdrawal Address
Bidding Address
l’agence du développement du haut atlas à l’adresse RN 9, Chwiter, Cercle d’Ait Ourir, Province d’Al Haouz
Opening Address
l’agence du développement du haut atlas à l’adresse RN 9, Chwiter, Cercle d’Ait Ourir, Province d’Al Haouz
Person
Teléfono
Correo electrónico
Fax

Created
27 de mayo de 2026 a las 03:24 UTC
Last updated
27 de mayo de 2026 a las 03:24 UTC
Time on display
Sign in days
Guarantee ratio
Views
Downloads
Awarding Minutes
No Minutes found
Share Official Link