Tender Details
FAVORITE
Object
Réalisation des travaux de construction de la piste de servitude et ouvrages annexes de la conduite d’adduction reliant le barrage Oued El Makhazine au barrage Dar Khrofa - 1ère tranche
Public Client
M4 / DORMVALL - OFFICE REGIONAL DE MISE EN VALEUR AGRICOLE DE LOUKKOUS
Time to Deadline
9
days
Deadline
28 de septiembre de 2026 a las 11:00
Morocco time
Total Estimate
13 202 235,60
Total Guarantee
Reference
Published
Main Category
Travaux
Execution Location
Procedure
Appel d'offres ouvert
Awarding Mode
Sur offre de prix
Electronic bidding
Required
Electronic signature
Required
Reserved to SMBs, individuals, Unions, ...
Variants accepted
No
Required Qualifications
Site Survey - Morocco time
| Travaux / Travaux de voiries, chemins et pistes / Pistes |
Item added to Favourites.
Item removed from Favourites.
Operation failed. Please refresh the page or try again later.
URL was copied to clipboard.
Files request submitted.
Files are already queued for download.
Operation failed. Please refresh the page or try again later.